
Add to Cart
Exported High-Quality High-Speed Steel Door Frame Roll Forming Machine
1. Description of Door Frame Roll Forming Machine
This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.
A door frame roll forming machine generally consists of a decoiler (a Hydraulic Decoiler is optional ), the main roll forming machine, a transmission system, a cutting tool, a hydraulic system, a hydraulic oil pump, a PLC control cabinet, and run-out tables
The punching also can be designed according to your needs. the door frame surface will be very smooth and beautiful without any scratches on the surface.
LBM factory manufacturing high-quality window frame machines, and they are mostly exported to foreign countries, such as Australia, UK, Ireland, Mexico, Brazil, Israel, Dubai, Russia, India, Taiwan, Singapore, Malaysia, Thailand, Philippines, Myanmar, Vietnam, South Africa, Mozambique, Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.
2. Technical Parameters of Door Frame Roll Forming Machine
No. | Item | Description |
1 | Suitable Plate Material | Thickness: 0.8-1.5mm, Galvanized steel coil |
2 | Working Speed | 12-15 m/min |
3 | Roller quantity | 18 rollers |
4 | Material of Roller | Gcr15, Quench HRC58-62 Plated Chrome |
5 | Material of Shaft | 45# Advanced Steel (Diameter: 76mm), thermal refining |
6 | Driven system | Chain drive |
7 | Main Power with reducer | 7.5KW |
8 | Cutting model: | Hydraulic Cutting Cr12mov |
9 | Material of Cutting blade | Cr12Mov, Quench HRC58-62 |
10 | Hydraulic Station Power | 4.0 KW |
11 | Operation system | Controlled by industry computer-PLC system. |
12 | PLC brand | Siemens with Japan English and Chinese Language |
13 | Touch Screen | Siemens Japan |
14 | Encoder | Omron, Japan |
15 | Electric parts | Schneider |
3. Main components of Door Frame Roll Forming Machine
Name | Quantity |
Uncoiler | 1set |
Coil sheet guiding device | 1set |
Main roll forming system | 1set |
Punching device | 1set |
Cutting device | 1set |
Hydraulic station | 1set |
PLC control system | 1set |
Support table | 1set |
4. Our Service
Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if the buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
5. Our Advantages
1). We are a factory with over 10 years of experience in manufacturing Roll Forming Machines;
2). We have our own powerful research and development team
3). We have more than 15 technicians.
4). 5 engineers with more than 20 years of experience
5). We have an advanced Laser Cutting Machine, CNC Machining Center, Polishing Line, Painting Line, etc. This advanced production equipment guarantees the good quality of each part and the appearance of our machines;
6). Our machines have reached the International Inspection Standards;
6. FAQ
Q: How to visit our company:
A: 1). Fly to Wuxi Airport directly;
2). By fast train From Shanghai Hongqiao station to Wuxi station, then we can pick up you at our factory.
Q: What should I provide if I want to customize the machine?
A: You need to provide the profile drawing, material, thickness, voltage, and your special requirements. Then, our technology team will analyze and offer you a suitable technical proposal.
3. Q: What is the Warranty?
A: 12 months
4. Q: What can you do if the machine is broken?
A: Our machine's warranty period is 12 months, if the broken parts can't repair, we will send new free parts to replace the broken parts. You need to pay the cost of the machine that exceeds the warranty period. we can negotiate to solve the problem, and we supply technical support for the whole life of the equipment.
5. Q: If need a technician to the workshop to debug and teach, how to do it?
A: We can send technicians to your country to install the machine. The buyer should bear the expenses including visa, round trip ticket, and suitable accommodation, also the buyer should pay the salary of 120 USD/day.