
Add to Cart
7.5KW Steel Downspout Roll Forming Machine Siemens PLC Control Fully Automatic
1. Downpipe roll forming machine description
Our downpipe roll forming machine has many advantages, just like high forming speed, low noise, stable transmission, easy operation, good appearance, and so on.
The metal downspout is made by using the color steel or GGPI coils roll-pressing and end-closing, then use the special equipment hit-to-bend and necking. The metal drainage system has excellent weather fastness. It has the advantages such as simple design, easy installation, safe and durability, elegance. It is widely used in modern villas and multiple raises buildings. LBM is producing the high-quality downspout roll forming machine and export to India, Bangladesh, Vietnam, Turkey, etc.
2. Technical details of downpipe roll forming machine
Condition | New |
Brand Name | Lebron-Machinery |
Voltage | 380V or 220V |
Warranty | 12 months |
Roller | 16rows |
Type | Downspout Roll Forming Machine |
Forming speed | 12-18m/min |
Dimension(L*W*H) | 7700mm*1200mm*1500mm |
Base | 300H steel |
Diameter of shaft | 70mm |
Roller material | 45# steel or hard chromium plating |
Cutting type | Hydraulic cutting type |
Cutting blade | Cr12 |
Main Motor Power(Kw) | 7.5Kw |
Weight | 7-8 Tons |
Color | As your request |
Material thickness | 0.3-0.8mm or As your request |
Material width | 330mm or As your request |
Transmission type | Chain transmission+deceleration motor |
Automation | Full-automatic |
Control system | PLC |
Place of Origin | Jiangsu, China (Mainland) |
After-sales Service Provided | Engineers available to service machinery overseas |
Installation service
a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
4. FAQ
1). Q: Are you a manufacturer, trading company?
A: We are a manufacturer, and we have built up our company since 2007.
2). Q: Where is your factory located?
A: Our factory address is: No. 551, the Zhenze West Road, Huazhuang Street, Binhu District, Wuxi City, Jiangsu, China
3). Q: How can I get to your factory?
A: Our factory is near Shanghai Airport, we can pick you up at the airport. Or you can by plane direct to Wuxi airport. We can pick you up.
4). Q: If I will need to stay in your place for a few days, is that possible to book the hotel for me?
A: It’s always my pleasure, a hotel booking service is available.