Steel Building Materials Steel Stud And Track Forming Machine Steel Framing Machine
1. Description:
For the Steel Stud and Track Roll Forming Machine, if a wider material is fed, the roll forming machine can produce a stud; if a smaller width material is fed, the roll forming machine can produce the stud, and it can also be programmed to punch on the stud or the track.
Studs, rails, and Omega slots are called drywall slots and are used to make economical wall and ceiling frames.
Metal studs and channels are strong, lightweight, easy to install, and come in a variety of sizes, providing ideal wall and ceiling applications for multi-layer plasterboard.
Gypsum board molding machine can be used automatically with Mitsubishi or Siemens control system
2. Main Technical Parameters
No. | Item | Description |
1 | Main Power | 5.5KW |
2 | Drive System | Chain |
3 | Roll Forming Speed | over 20m/min |
4 | Roller Station | 12 stations |
5 | Roller Material | 45# steel, quenched. Coated with 0.05mm chrome |
6 | Shaft Material | 45# steel, quenched, coated with 0.05mm chrome |
7 | Shaft diameter | 70mm |
3. Workflow:
Uncoiling → Feeding & Guiding → Roll Forming → Hydraulic Punching → Servo Tracking Cutting → Receiving
4. Main Components
No. | Name | Quantity |
1 | 3-Ton Decoiler | 1 Set |
2 | Feeding Guider | 1 Set |
3 | Roll Forming Machine Unit | 1 Set |
4 | Hydraulic Punching Device | 1 Set |
5 | Hydraulic Servo Tracking Cutting Device | 1 Set |
6 | Hydraulic Station | 1 Set |
7 | Receiving Table | 1 Set |
8 | Electric Control Cabinet | 1 Set |
5. Brands of Electrical Appliances
No. | Name & Brand | Brand |
1 | PLC | Germany Siemens |
2 | Frequency Converter | Japan Yaskawa |
3 | Touch Screen | Germany Siemens |
4 | Encoder | Japan Omron |
5 | Other Electrical Accessories | France Schneider |
6. After-Sale Service
After the machine arrives at the destination, if the buyer wishes, the seller will send technicians to the buyer’s factory for installation. The buyer needs to provide some technical personnel to assist in the installation work.
The installation period is approximately 5 days. The buyer should prepare for the steel plate and place the machine on the foundation before the seller’s technicians leave.
The buyer should arrange accommodation, food, and transportation at the destination
Training time: 2 days. (If the buyer needs, we can provide training at the operation site)
Within three months after the goods arrive at the port of destination, if the buyer does not require payment in installments, the goods shall be counted as qualified goods. The inspection standards are based on the technical standards signed by both parties and our company standards.