
Add to Cart
1. Description of Door Frame Roll Forming Machine
A door frame roll forming machine generally consists of a decoiler (a hydraulic decoiler is optional ), a main roll forming machine, transmission system, a cutting tool, hydraulic system, a hydraulic oil pump, a PLC control cabinet and run-out tables
Lebron-Machinery is manufacturing the high quality door frame machines, and they are mostly exported to the foreign countries, such as India, Angola, Ethiopia, Ghana, Zambia, Brazil, Argentina, Thailand, Philippines, Pakistan, Russia, etc.
2. Technical Parameters of Door Frame Roll Forming Machine
Machine Specifications | |
Weight | About 6000kgs |
Size | About 10.0m*1m*1.4m (L x W x H) |
Color | Main color: Blue |
Warning color: Yellow | |
Suitable Raw Material | |
Material | Galvanized steel strip |
Thickness | 0.8~1.2mm |
Coil width | 240mm |
Yield strength | 235Mpa |
Main Technical Parameters | |
Quantity of forming rollers stations | 20 ~ 22rows |
Diameter of forming rollers shafts | 75 mm |
Roll Forming Speed | 10-15m/min |
Production Speed | Approx. 8m/min |
Forming rollers material | 45# steel, coated with chrome, quenched |
Cutter material | Cr12 mould steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric power requirement | Main motor power: 7.5 Kw |
Hydraulic unit motor power: 4 kw | |
Electric voltage | 380V 50Hz 3 Phase (as per local requirement) |
3. After Sale Service
Install and Training:
If buyers come to our factory to inspect, the training to install and operate is provided face to face.
If not, manual and video is provided to show how to install and operate.
After-sale Service:
a .The seller will debug the machines freely in China, and the traffic expense in China of the technique people will be paid by the seller.
When technique men go to the buyer's place to debug the machines, the buyer should pay the
expense of accommodation, and round-trip tickets for the seller’s men. and pay the technician USD60 per day.
b. If the buyer sends people to receive the training of the operation given by the seller, during the training period, the seller should pay the expense of accommodation, and traffic for the buyer's men.